Air Quality Permitting

Steigers Corporation's expertise in air quality issues has made us a leader in resolving sensitive issues facing many clients and their respective projects. Compliance with the Clean Air Act and its amendments is the foremost concern for many new and existing projects. Our extensive experience means that we can analyze the issues quickly and find cost-saving solutions for our clients.

Our close working relationships with many state agencies and federal EPA regions enable us to quickly and effectively communicate with agency personnel, to address and resolve issues of concern.


"The Title V application was most excellent, and Westward Seafoods greatly appreciates the expeditious efforts of the Steigers Corporation in producing the document and in meeting the difficult application schedule."

David W. Boisseau
Westward Seafoods

       
  Westward Facility Alaska

Air quality services:

  • Prevention of Significant Deterioration (PSD) and state air quality program permitting nonattainment area permitting
  • Title V (Clean Air Act) permitting for existing facilities
  • Best Available Control Technology (BACT) analyses
  • air quality dispersion modeling
  • air quality impact analyses
  • Class I and Class II Air Quality Related Values (AQRV) and visibility assessments (required for land areas classified as pristine)
  • ambient air quality, air toxics, and meteorological monitoring
  • source impact analyses and exposure assessment
  • state and National Ambient Air Quality Standards (NAAQS) and PSD increment compliance demonstrations
  • source emission monitoring
  • emissions inventory services
  • emissions and permit audits
  • regulatory analysis and applicability determination.

 

As part of a combustion-turbine installation project, Barrow Utilities and Electric Cooperative, Inc. (BUECI) was able to avoid Prevention of Significant Deterioration major source classification. We conducted a dispersion modeling analysis that provided BUECI with the flexibility to operate a wide range of electric power generating units to meet their customers' demands and to consume fuel in the operator's choice of generating units. We also overcame the onerous fuel testing and monitoring requirements that had been imposed by the regulatory agencies and were able to obtain approval of less-costly and time-consuming methods for compliance with the applicable New Source Performance Standards (NSPS).

 

Steigers Corporation staff air permitting projects include:

Air Permit Terrain Modeling for Gas Production Facility, Wyoming

Air Quality Environmental Assessment Modeling of Fermentation Process, Puerto Rico

Air Quality Modeling Analysis for Various Oil and Gas Production Facilities, Wyoming

Alyeska Generation Plant PSD Avoidance, NSPS Applicability Determination, and Title V Operating Permits, Alaska

Background Source Interaction Modeling for New Power Plant, Massachusetts

BUECI Power Plant PSD Avoidance Permit and Title V Operating Permit, Alaska

Chemical Plant Air Quality Monitoring Program and PSD Permit Modification, Wyoming

Coal-Fired Cogeneration Feasibility Pollutant Impact Analysis, Massachusetts
Compressor Station NO2 Modeling, Pennsylvania

Evaluation of Air Emission Scenarios and Assessment of Potential Air Quality Impacts for Denton Rawhide Gold Mine, Nevada

Gilt Edge Gold Mine Expansion Project EIS Air Quality and Climatology Sections, South Dakota

Healy Clean Coal Plant Comprehensive Air Quality Services, Alaska
Industrial Paper Manufacturing Cogeneration PSD and Support Services, Alabama

Knik Arm Power Plant Repowering Project Air Quality Construction Permit, Alaska

Lancaster Resource Recovery Facility PSD Permit, Massachusetts
Lehi Combined-cycle Power Plant Notice of Intent Dispersion Modeling, Utah

National Energy Plant One Waste Tire-to-Energy Power Plant Project,
Colorado

Paper Mill Expansion PSD Permit Screening and Refined Modeling, South Carolina

PSD Permit Modeling for 38-MW Coal-Fired Cogeneration Facility, Massachusetts

Redwing Creek Gas Plant Air Quality Modeling Analysis, North Dakota
Source Impact Analysis for Carbon Plant Expansion, Virgini

Stack Height Optimization Study for Compressor Stations, North Dakota
Swampy Acres Generating Station Siting Analysis and PSD Avoidance Construction Permit, Alaska

Spruce Saddle Communications Site EA, Colorado
Uinta Basin Air Compliance Evaluations, Utah

WyCal Pipeline Dispersion Modeling and Construction Permits, Wyoming, Utah, and Arizona

Yankee Gulch Project PSD, Title V Operating Permits, and state Air Quality Compliance Plans, Colorado.

 

 

Healy Clean Coal Plant, AlaskaHealy Clean Coal Plant, Alaska
 

 

Water and Wetlands Permitting    
Land Use Permitting
   

 

Home

© Steigers Corporation 2001
1510 West Canal Court, Suite 1000
Littleton, CO 80120-5639